{"section":{"heading":"Related Images and Videos (30)","tiles":[{"href":"/en/st/0869292445","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart; Tunnel Patron Andrea Klett Eininger with a statue of Saint Barbara and miners Georgi Stankov (left) and Jens Straube","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292445/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292459","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart; Tunnel Patron Andrea Klett Eininger, Stefan Kratochwill, Chairman of the Executive Board of STRABAG SE The 11-kilometer-long rail tunnel is part of the Stuttgart 2","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292459/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292463","title":"Groundbreaking for the Pfaffensteig Tunnel in Stuttgart. From right: Stefan Kratochwill, Chairman of the Executive Bo","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292463/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292465","title":"Groundbreaking for the Pfaffensteig Tunnel in Stuttgart. From right: Stefan Kratochwill, Chairman of the Executive Bo","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292465/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292466","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart At the tunnel entrance, from the right: Evelyn Palla, Chairwo","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292466/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292467","title":"Groundbreaking for the Pfaffensteig Tunnel in Stuttgart. At the tunnel entrance, from t","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292467/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292469","title":"Groundbreaking for the Pfaffensteig Tunnel in Stuttga","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292469/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292474","title":"Construction Begins on th","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292474/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869292478","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the airport and, thus, with the new central station. Construction costs are currently estimated at 2.5 billion euros. Th","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869292478/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247730","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart At the tunnel portal, from","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247730/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247728","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart At the tunnel entrance, from the right: Evelyn Palla, Chairwo","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247728/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247726","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the airport and, thus, with the new central station. Construction costs are currently estimated at 2.5 billion euros. Th","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247726/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247725","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the airport and, thus, with the new central station. Construction costs are currently estimated at 2.5 billion euros. Th","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247725/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247724","title":"Groundbreaking for the Pfaffensteig Tunnel in Stuttgart: Tunnel patron Andrea Klett Eininger with a statue of Saint Barbara and miners Georgi Stankov and Jens Straube at the tunnel porta","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247724/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247723","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the airport and, thus, with the new central station. Construction costs are currently estimated at 2.5 billion euros. Th","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247723/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247720","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart: Tunnel patron Andrea Klett Eininger with S21 chaplain Peter Maile and tunnel foreman Jens Straube. The 11-kilometer-long rail tunnel is part of the Stuttgart 21 pr","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247720/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247719","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart; Tunnel Patron Andrea Klett Eininger with a statue of Saint Barbara, patron saint of tunnel builders and miners. The 11-kilometer-long rail tunn","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247719/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247718","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart: Tunnel patron Andrea Klett Eininger with S21 chaplain Peter Maile and tunnel foreman Jens Straube. The 11-kilometer-long rail tunnel is part of the Stuttgart 21 pr","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247718/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247717","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Stefan Kratochwill, Chairman of the Executive Board of STRABAG SE The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zur","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247717/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247715","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Steffen Bilger (CDU), Federal Minister of Transportation The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the airport","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247715/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247713","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Evelyn Palla, Chairwoman of the Executive Board of Deutsche Bahn AG The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247713/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247712","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Evelyn Palla, Chairwoman of the Executive Board of Deutsche Bahn AG The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247712/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247710","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Evelyn Palla, Chairwoman of the Executive Board of Deutsche Bahn AG The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247710/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0869247697","title":"Construction Begins on the Pfaffensteig Tunnel in Stuttgart Rainer Wieland, Chairman of the Stuttgart Region Association The 11-kilometer-long rail tunnel is part of the Stuttgart 21 project and, starting in 2033, will connect the Gäubahn line toward Zurich with the","thumbnailUrl":"https://stg-www.imago-images.com/bild/st/0869247697/s.jpg","credit":"IMAGO / Arnulf Hettrich","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}